News Flash

TxDOT News Release

Posted on: December 16, 2020

Bridge Rail Repairs Still Closed From FM 2818 to FM 2154

TxDOT

TxDOT regrets to notify drivers that the reopening of the flyover bridge from East Bound FM 2818 (Harvey Mitchell Parkway) to South Bound FM 2154 (Wellborn Road) in College Station, that was scheduled to reopen tomorrow morning, has been delayed due to the cold temperatures.  The low temperatures experienced over the last couple of nights have delayed the curing of the concrete on the repaired bridge rail.  For the safety of the travelling public, TxDOT will delay the reopening until the bridge rail has cured to sufficient concrete strength.  We will continue to monitor and check the concrete strength and reopen the bridge as soon as an acceptable strength is achieved to protect the public.  We apologize for the inconvenience and appreciate the patience of the public during this extended closure.

For more information, contact Bobby.Colwell@txdot.gov or (979) 778-9764.

Facebook Twitter Email

Other News in TxDOT News Release

TxDOT

FM 2347 to Begin Sunday Night

Posted on: April 23, 2021
TxDOT

Upcoming Active Transportation Call

Posted on: December 22, 2020
TxDOT

Flyover Bridge is Open

Posted on: December 18, 2020
TxDOT

Bridge Rail Repair from FM 2818 to FM 2154

Posted on: December 15, 2020
TxDOT

Update for US190/SH 6

Posted on: February 26, 2020
TxDOT

Open House for Raised Medians on FM 2347

Posted on: January 17, 2020