Project Updates

◄ Back
December 9, 2019 1:33 PM

State Highway 6 Expansion Project

The Texas Department of Transportation (TxDOT), in partnership with the Bryan-College Station Metropolitan Planning Organization (BCS MPO), is planning for improvements to SH 6 from US 190/SH 21 to SH 40/William D. Fitch.

SH 6 is a vital north-south highway for Bryan, College Station, Texas A&M University, Brazos County and the region. It is part of the Texas Highway Freight Network, Texas Highway Trunk System and is a Hurricane Evacuation Route. It is a key corridor providing access to the Energy Sector as well as relief to other Energy Sector roadways. The existing corridor consists of 2 lanes in each direction separated by either a wide grass median or concrete traffic barrier.


Facebook Twitter Email